Rekrutmen Pegawai PT Adaro Energy Tbk – Dalam rangka untuk memenuhi kebutuhan SDM yang berkompeten dibidangnya, saat ini PT Adaro Energy kembali memberikan kesempatan berkarir bagi lulusan diploma dan sarjana melalui Lowongan Kerja PT Adaro Energy Tbk dengan mengisi posisi sebagai berikut :
MAINTENANCE I&C SUPERVISOR
Requirements:
- Minimum Diploma Degree (D3) graduate majoring in Electrical Engineering
- Minimum 3 (three) years of experience as I&C Maintenance Supervisor position in the power plant industry
- Good Communication and Leadership Skill
- Broad experience and proven skills in coal-fired power plant operation & maintenance will be an advantage.
- Good command in English both verbal and written
- Willing to be based in Tanjung – Tabalong, South Kalimantan
SHIPYARD QUALITY CONTROL SECTION HEAD
Requirements:
- Minimum Bachelor Degree (S1) of Naval Architecture
- Minimum 2 years of experience in the same or related position in shipyards or other similar industries
- Able to handle field inspection requests, knowledge of quality standards in ship repairing and able to make requested inspection reports by the class surveyor and the shipowner
- Able to set up QC inspection procedure
- Understanding about welding inspection (can be supported by certificate)
- Proven communication, leadership, and managerial skills.
- Willing to be placed in South Kalimantan
SHIPYARD PRODUCTION SECTION HEAD
Requirements:
- Minimum Diploma Degree (D3) of Naval Architect, Ocean Engineering, & Marine Engineering
- Minimum 2 years of experience in the same or related position in shipyards or other similar industries
- Able to plan, coordinate and control all production activities in ship repairs
- Familiar with writing reports
- Willing to be placed in South Kalimantan
BLASTING & PAINTING OFFICER
Requirements:
- Minimum Diploma Degree (D3)
- Minimum 2 years of experience in the same or related position in shipyards or other similar industries
- Able to manage and direct man power to finish project attentively
- Able to give technical solutions to problem in the field
- Familiar with writing blasting & painting reports
- Willing to be placed in South Kalimantan
MECHANIC
Requirements:
- Minimum Senior High School, preferably majoring in Mechanical Engineering
- Minimum 5 years experience as Mechanic for Heavy Equipment
- Broad experience and proven skills in pump industry will be advantage
- Good communication skill
- Willing to be located in Tanjung – Tabalong, South Kalimantan
UNIT CONTROLLER
Requirements:
- Minimum Diploma Degree (D3) graduate majoring in Mechanical or Electrical Engineering
- Have a minimum 3 years of experience as Operator in manufacturing or power plant
- Preferably has broad experience and proven skills in coal-fired power plant operation.
- Good communication skill
- Good command in English both verbal and written
- Willing to be located at Tanjung – Tabalong, South Kalimantan
How To Apply
Please submit your applications by visit the following link :
Notes :
- Only shortlisted candidates will be notified
- Closing date : September 21, 2020
Tentang PT Adaro Energy Tbk
PT Adaro Energy Tbk. is an Indonesian energy group that focuses on coal mining through subsidiaries. The principal location is at Tabalong district in South Kalimantan, where the subsidiary PT Adaro Indonesia operates the largest single-site coal mine in the southern hemisphere (roughly 110,000 tons of coal per day). Adaro Energy operates under a first-generation CCA (coal co-operation agreement) with the Indonesian Government valid until 2022.
PT Adaro Indonesia operates the largest single-site coal mine in the southern hemisphere. We operate under a first-generation CCA (coal co-operation agreement) with the Indonesian Government valid until 2022.From our South Kalimantan mine’s three pits we produce one of the world’s cleanest coals, trademarked Envirocoal. It is a sub-bituminous, moderate calorific value coal producing ultra-low sulphur, ash and NOx emissions.
We are proud of our record of continuous growth over the two decades that we have been mining in Kalimantan. In 2014 we delivered 56.2 million tonnes of coal, and in 2015 we plan to produce between 54 million and 56 million tonnes.
Our coal is primarily sold to power generation providers, and we sell an average of about 25% of our coal to customers domestically in Indonesia and 75% to overseas customers, predominantly in Asia.